01Prepare & protectWe use specialized roofing equipment to contain tear-off debris, keep it off the ground, and protect landscaping, siding, windows, and work areas.
02Tear off to the deckOld shingles, underlayment, and worn roofing components are removed for a clean rebuild.
03Inspect the structureThe exposed plywood, framing, roof edges, and trouble areas are carefully evaluated.
04Repair where neededDamaged decking, fascia, and related roof components are replaced before covering the roof.
05Dry-in the roofDrip edge, leak barrier, and roof deck protection create the waterproof foundation.
06Flash & ventilateValleys, walls, chimneys, skylights, pipe boots, and attic airflow are properly detailed.
07Install the GAF systemStarter, field shingles, ridge ventilation, and caps are installed to GAF system standards.
08Inspect & cleanWe verify the finished work, remove contained debris, clear the gutters and property, and complete a magnetic nail sweep.